Construction Site September 2007

Construction Site September 2007

Social and Behavioral Sciences building

Social and Behavioral Sciences building sketch

Social and Behavioral Sciences Building

View from the Northwest

View from the Northeast

View from Parking Structure

Social and Behavioral Sciences building

Construction Site October 2007 - View of upper pad

Construction Site October 2007 - Lower pad excavation and rebar placement

Construction Site October 2007 - Placement of column rebar

The first concrete pour - concrete placement for lower pad footings

Construction Site October 2007 - Concrete placement and concrete consolidation for footing

Construction Site October 2007 - Completed footing concrete pourr

Construction Site January 2008 - Upper Pad - Note column wall forms. These columns will be poured with grey concrete

Construction Site January 2008 - Lower Pad - Note wall form at lower end of picture.<br>This form is a perimeter wall and will be poured with colored concrete.

Construction Site January 2008 - Wall form prep work at Upper Pad

Construction Site January 2008 - Close-up of Perimeter Wall/Lantern Stair formwork being constructed

Construction Site February 2008 - Upper Pad - Formwork prep continues

Construction Site February 2008 - Lower Pad - Form work in place and colored concrete pour scheduled for 02/08/08

Construction Site February 2008 - Lower Pad - Close-up of wall forms

Construction Site February 2008 - Lower Pad - Wall forms as seen "Inside" of Lower Pad

Construction Site February 2008 - S&BS - Lower pad colored concrete at lantern stair

S&BS - Upper Pad with Vapor Barrier (in Green)

S&BS - 1<sup>st</sup> Floor Deck Slab being Poured (at Lower Pad Area)

S&BS - 1<sup>st</sup> Floor Deck Slab (at Lower Pad Area)

S&BS - Exterior Concrete (at Lower Pad Area)

S&BS - Close-up of Vapor Barrier and Rebar Installation for Slab-On-Grade (Upper Pad Area)

S&BS - Shear Wall Formwork Installation (Upper Pad Area)

S&BS - Upper Pad with Concrete Slab-on-Grade Completed

S&BS - 1<sup>st</sup> Floor Deck Slab with Formwork Installation at Columns (Lower Pad Area)

S&BS - 1<sup>st</sup> Floor Deck Slab

S&BS - Interior Lobby Columns with Formwork Removedbr />

S&BS - Close-up of Interior Lobby Column Detail

S&BS - Upper Pad with 2<sup>nd</sup> Story (East) Deck Under Construction

S&BS - 2<sup>nd</sup> Floor Deck (West) Shoring Installation Underway

S&BS - 2<sup>nd</sup> Floor Deck (West) Shoring and Plywood Installation Underway

S&BS - Lobby View

S&BS - Upper Pad with 2<sup>nd</sup> Story (East) Deck Under Construction

S&BS - 2<sup>nd</sup> Floor Deck (West) Concrete Completed

S&BS - View of Exterior of Building

S&BS - Close-up of Garden Level Ceiling- Mechanical, Electrical, Plumbing Piping

S&BS - Upper Pad with 3<sup>rd</sup> Story (East) Deck Under Construction

S&BS - 2<sup>nd</sup> Floor Deck (West) Concrete Wall Pours Upcoming

S&BS - Construction Stair Towers Erected on East & West Sides of Building

S&BS - Close-up of East End of Project

S&BS - Dichroic Glass Mock-Up/Glass to the Left was approved
for use on the Lantern Stair

S&BS - Close-Up of Dichroic Glass Mock-Up Sample

S&BS - Upper Pad with 3<sup>rd</sup> Story (East) Deck Concrete Pour Completed

S&BS - 2<sup>nd</sup> Floor Deck (West) Concrete Deck Pour Upcoming

S&BS - View from 3<sup>rd</sup> Floor of Project (Looking West)

S&BS - View from 3<sup>rd</sup> Floor of Project (Looking West toward S&BS Unit 2)

S&BS - Upper Pad with 3<sup>rd</sup> Story (East) Deck Concrete Pour Completed. Wall Pours Upcoming

S&BS - 3<sup>rd</sup> Floor Deck (West) Concrete Deck Pour Upcoming

S&BS - 3<sup>rd</sup> Floor Deck Shoring Spanning the Lobby

S&BS - Man Lift Installation

S&BS - Upper Pad with 3<sup>rd</sup> Story (East) Deck Concrete Pour Completed. Wall Pours Upcoming

S&BS - 3<sup>rd</sup> Floor Deck (West) Concrete Deck Pour Upcoming

S&BS - 1<sup>st</sup> Floor Mechanical Duct Installation

S&BS - 1<sup>st</sup> Floor Piping Installation

S&BS - 4<sup>th</sup> Story (West) Under Construction

S&BS - Close-up of 3<sup>rd</sup> Floor (West) Wall Forms

S&BS - Close-up of 4<sup>th</sup> Floor (West) Rebar Installation

S&BS - Garden Level Utilities Installation

S&BS - As Seen from Pereira Drive

S&BS - Close-up of Stair #3 (West) Wall Forms

S&BS - Close-up of Security Camera Installation @ Lantern Stair

S&BS - 1<sup>st</sup> Floor Utilities Installation

S&BS - (East) Roof Shoring & Plywood Installation

S&BS - 5th Floor Deck (West). Note Column Formwork

S&BS - 5th Floor Deck (East)

S&BS - 5th Floor Deck (East) being Prepared for Upcoming Concrete Pour

S&BS - 3rd Floor Deck HVAC and Fire Sprinkler Piping Installation

S&BS - Interior Partition Framing/Furr-Out

S&BS - (East) Roof Concrete Pour Completed

S&BS - 5th Floor Deck (West). Roof Plywood Installation Continues

S&BS - Interior Partition Installation

S&BS - HVAC ductwork Installation

S&BS - HLantern Stair

S&BS - 2nd Floor Deck and Lobby Below

S&BS - Fifth Floor West looking north

ES&BS - East Stair under construction

S&BS - North Lobby Entry facing Pereira Drive

S&BS - Fifth Floor Tenant Improvement Supplies

S&BS - Lantern Stair structure complete

S&BS - Third Floor partition framing

S&BS - Second Floor partition framing

S&BS - First Floor partition gyp board installed

&BS - Garden Level entry ready for primer

S&BS - Garden Level fMRI Procedure Control Room

S&BS - South Arcade receives Brick Veneer and Prep for Stucco Finish

S&BS - South Entry receives 2 story window wall framing

S&BS - Electrical Cables being run to Pod A Supply

S&BS - Fifth Floor receives stucco (white) finish to match windows

S&BS - Your Building As It Stands Today

S&BS - Your Building One Year Ago Today

Exterior Stairwells nearing completion

Exterior finishes @ all stairwells continue

5th floor MEP and priority wall installations continue

Another view of 5th floor MEP and priority wall installations

Double height lobby progresses

Soffits above the lobby doors are complete

Exterior finishes nearing completion

5th floor interior wall framing underway

4th floor walls painted and ceilings being installed

4th floor ceiling installation continues

3rd floor walls painted and ceilings being installed

3rd floor ceiling installation continues

2nd floor ceiling installation continues

2nd floor lobby soffit installation continues

Work catches up where construction elevator once stood

Toilet room tile continues on all floors

Preparation for the accessible ramp and stair underway

Network cabling has begun in the Garden Level

Interior finishes continue at Garden Level

Interior finishes and casework continue at 1st floor

Ceiling installation completed at 2nd floor Lobby

Construction elevator bays continue to catch up

Paint and finishes continue at 4th floor

Framing and insulation installation continues at 5th floor

Site lighting and primary tree placement underway

Site lighting and primary tree placement underway

Garden Level Canopy installation underway

Irrigation system installation underway

Lobby flooring being prepped for Terrazzo

Lobby flooring being prepped for Terrazzo