Watch us grow!

Construction Site September 2007
Construction Site September 2007
Social and Behavioral Sciences building
Social and Behavioral Sciences building sketch
Social and Behavioral Sciences Building
View from the Northwest
View from the Northeast
View from Parking Structure
Social and Behavioral Sciences building
Construction Site October 2007 - View of upper pad
Construction Site October 2007 - Lower pad excavation and rebar placement
Construction Site October 2007 - Placement of column rebar
The first concrete pour - concrete placement for lower pad footings
Construction Site October 2007 - Concrete placement and concrete consolidation for footing
Construction Site October 2007 - Completed footing concrete pourr
Construction Site January 2008 - Upper Pad - Note column wall forms. These columns will be poured with grey concrete
Construction Site January 2008 - Lower Pad - Note wall form at lower end of picture.<br>This form is a perimeter wall and will be poured with colored concrete.
Construction Site January 2008 - Wall form prep work at Upper Pad
Construction Site January 2008 - Close-up of Perimeter Wall/Lantern Stair formwork being constructed
Construction Site February 2008 - Upper Pad - Formwork prep continues
Construction Site February 2008 - Lower Pad - Form work in place and colored concrete pour scheduled for 02/08/08
Construction Site February 2008 - Lower Pad - Close-up of wall forms
Construction Site February 2008 - Lower Pad - Wall forms as seen "Inside" of Lower Pad
Construction Site February 2008 - S&BS - Lower pad colored concrete at lantern stair
S&BS - Upper Pad with Vapor Barrier (in Green)
S&BS - 1<sup>st</sup> Floor Deck Slab being Poured (at Lower Pad Area)
S&BS - 1<sup>st</sup> Floor Deck Slab (at Lower Pad Area)
S&BS - Exterior Concrete (at Lower Pad Area)
S&BS - Close-up of Vapor Barrier and Rebar Installation for Slab-On-Grade (Upper Pad Area)
S&BS - Shear Wall Formwork Installation (Upper Pad Area)
S&BS - Upper Pad with Concrete Slab-on-Grade Completed
S&BS - 1<sup>st</sup> Floor Deck Slab with Formwork Installation at Columns (Lower Pad Area)
S&BS - 1<sup>st</sup> Floor Deck Slab
S&BS - Interior Lobby Columns with Formwork Removedbr />
S&BS - Close-up of Interior Lobby Column Detail
S&BS - Upper Pad with 2<sup>nd</sup> Story (East) Deck Under Construction
S&BS - 2<sup>nd</sup> Floor Deck (West) Shoring Installation Underway
S&BS - 2<sup>nd</sup> Floor Deck (West) Shoring and Plywood Installation Underway
S&BS - Lobby View
S&BS - Upper Pad with 2<sup>nd</sup> Story (East) Deck Under Construction
S&BS - 2<sup>nd</sup> Floor Deck (West) Concrete Completed
S&BS - View of Exterior of Building
S&BS - Close-up of Garden Level Ceiling- Mechanical, Electrical, Plumbing Piping
S&BS - Upper Pad with 3<sup>rd</sup> Story (East) Deck Under Construction
S&BS - 2<sup>nd</sup> Floor Deck (West) Concrete Wall Pours Upcoming
S&BS - Construction Stair Towers Erected on East & West Sides of Building
S&BS - Close-up of East End of Project
S&BS - Dichroic Glass Mock-Up/Glass to the Left was approved
for use on the Lantern Stair
S&BS - Close-Up of Dichroic Glass Mock-Up Sample
S&BS - Upper Pad with 3<sup>rd</sup> Story (East) Deck Concrete Pour Completed
S&BS - 2<sup>nd</sup> Floor Deck (West) Concrete Deck Pour Upcoming
S&BS - View from 3<sup>rd</sup> Floor of Project (Looking West)
S&BS - View from 3<sup>rd</sup> Floor of Project (Looking West toward S&BS Unit 2)
S&BS - Upper Pad with 3<sup>rd</sup> Story (East) Deck Concrete Pour Completed. Wall Pours Upcoming
S&BS - 3<sup>rd</sup> Floor Deck (West) Concrete Deck Pour Upcoming
S&BS - 3<sup>rd</sup> Floor Deck Shoring Spanning the Lobby
S&BS - Man Lift Installation
S&BS - Upper Pad with 3<sup>rd</sup> Story (East) Deck Concrete Pour Completed. Wall Pours Upcoming
S&BS - 3<sup>rd</sup> Floor Deck (West) Concrete Deck Pour Upcoming
S&BS - 1<sup>st</sup> Floor Mechanical Duct Installation
S&BS - 1<sup>st</sup> Floor Piping Installation
S&BS - 4<sup>th</sup> Story (West) Under Construction
S&BS - Close-up of 3<sup>rd</sup> Floor (West) Wall Forms
S&BS - Close-up of 4<sup>th</sup> Floor (West) Rebar Installation
S&BS - Garden Level Utilities Installation
S&BS - As Seen from Pereira Drive
S&BS - Close-up of Stair #3 (West) Wall Forms
S&BS - Close-up of Security Camera Installation @ Lantern Stair
S&BS - 1<sup>st</sup> Floor Utilities Installation
S&BS - (East) Roof Shoring & Plywood Installation
S&BS - 5th Floor Deck (West). Note Column Formwork
S&BS - 5th Floor Deck (East)
S&BS - 5th Floor Deck (East) being Prepared for Upcoming Concrete Pour
S&BS - 3rd Floor Deck HVAC and Fire Sprinkler Piping Installation
S&BS - Interior Partition Framing/Furr-Out
S&BS - (East) Roof Concrete Pour Completed
S&BS - 5th Floor Deck (West). Roof Plywood Installation Continues
S&BS - Interior Partition Installation
S&BS - HVAC ductwork Installation
S&BS - HLantern Stair
S&BS - 2nd Floor Deck and Lobby Below
S&BS - Fifth Floor West looking north
ES&BS - East Stair under construction
S&BS - North Lobby Entry facing Pereira Drive
S&BS - Fifth Floor Tenant Improvement Supplies
S&BS - Lantern Stair structure complete
S&BS - Third Floor partition framing
S&BS - Second Floor partition framing
S&BS - First Floor partition gyp board installed
&BS - Garden Level entry ready for primer
S&BS - Garden Level fMRI Procedure Control Room
S&BS - South Arcade receives Brick Veneer and Prep for Stucco Finish
S&BS - South Entry receives 2 story window wall framing
S&BS - Electrical Cables being run to Pod A Supply
S&BS - Fifth Floor receives stucco (white) finish to match windows
S&BS - Your Building As It Stands Today
S&BS - Your Building One Year Ago Today
Exterior Stairwells nearing completion
Exterior finishes @ all stairwells continue
5th floor MEP and priority wall installations continue
Another view of 5th floor MEP and priority wall installations
Double height lobby progresses
Soffits above the lobby doors are complete
Exterior finishes nearing completion
5th floor interior wall framing underway
4th floor walls painted and ceilings being installed
4th floor ceiling installation continues
3rd floor walls painted and ceilings being installed
3rd floor ceiling installation continues
2nd floor ceiling installation continues
2nd floor lobby soffit installation continues
Work catches up where construction elevator once stood
Toilet room tile continues on all floors
Preparation for the accessible ramp and stair underway
Network cabling has begun in the Garden Level
Interior finishes continue at Garden Level
Interior finishes and casework continue at 1st floor
Ceiling installation completed at 2nd floor Lobby
Construction elevator bays continue to catch up
Paint and finishes continue at 4th floor
Framing and insulation installation continues at 5th floor
Site lighting and primary tree placement underway
Site lighting and primary tree placement underway
Garden Level Canopy installation underway
Irrigation system installation underway
Lobby flooring being prepped for Terrazzo
Lobby flooring being prepped for Terrazzo